Follow the progress of our new track and field construction!

November 15:
The gate leading to the athletics facilities was uncovered today!
South Seneca Falcons gateway
score board

November track progress

November 8:
The plan was to have the track surface installed during the week of October 30, but the rainy weather combined with cold temperatures overnight are going to prevent this final step from happening until the spring. This is a disappointing setback; we anticipated the track would be ready to go for the start of track practices in March. As soon as we get some sustained warm temperatures in March or April, the track surface will go down and we'll be ready to host. 

October 12:
Grass has been put on the field, the backstop is being installed






September 27:
Track being paved, and the sound system is being set up
tracking being paved

September 12:
September track and field construction progress

Entryway construction

Early August: bleachers and light towers
track and bleachers construction

track lights construction
____________________________________________________________________________________

Early July: completion of mason blockwork on concession building; construction of pillars for welcome gate; stone subbase on track and bleacher area; trusswork and roofing on concession building; beginning to stand field lighting poles; pour concrete for bleacher pad
_____________________________________________________________________________________

Late June: Mason blockwork begins on concession building; stone goes on track

concession stand construction

laying stone on track
___________________________________________________________________________________________________________

Pictures, Week of June 12

Early June: Site Contractor working on water and utility line extensions; track is being cut to subgrade elevation; begin underground electrical and plumbing rough-in for concession building; beginning of foundation work for concession building
__________________________________________________________________________________________________

Pictures, Week of June 8
----------------------------------------------------------------------------------------------------------------------------------------------------------------------


In addition to the continued work to grade the fields and stockpile topsoil, the walls of the concessions/restroom building will begin to go up during the weeks of May 15 and May 22.

Pictures, Week of May 15
___________________________________________________________________________________________________

During the week of May 8, the concrete footings for the concessions building were poured. 
____________________________________________________________________________________________________

In the early part of May, contractors are cutting the site to the grade necessary to build the track. Work is also beginning on the construction of the restrooms and concessions building that will be adjacent to the bleachers once the work is complete.

Pictures, Week of May 8

____________________________________________________________________________________________________

During the weeks of April 24 and May 1, contractors are tying in water and sanitary lines, installing new manhole structures, and working through the process of screening the topsoil removed from the existing field and moving it off the field to our temporary storage location to the north.

Pictures, Week of May 1

Pictures, Week of April 24
_____________________________________________________________________________________________________


Pictures, Week of April 17
 


During the Spring Break week (April 17-21), contractors will be working to extend sewer and sanitary water lines along South Street. There will be NO ACCESS TO THE SCHOOL FROM SOUTH STREET during this work. 
_________________________________________________________________________________________________


During the week of April 10, we will take advantage of the better weather to continue stripping topsoil, removing material, and begin investigating underground electrical conduit routing for the concession stand.

Pictures, Week of April 10

Pictures, Weekend of April 8-9
 


The next phase, beginning as early as the week of April 3, will be to begin stripping topsoil from the existing field. This work is weather dependent, and may be delayed by rain. 

Pictures- week of April 3
 


Pictures of construction site before the beginning of the project

First groundbreaking took place on March 27, 2017. This was the removal of the split rail fence on South Street, and the building of a staging area for construction vehicles at the edge of the site.

Pictures taken during first week of construction, March 27-31, 2017


 



 